<div dir="ltr"><div>Hi Atin,<br><br>FMPOV, 2 weeks time looks to be good, at the same time, please give importance for the product version it is reported. If they are into our running stable or near versions, we can be some more flexible.<br><br></div>--Humble<br></div><div class="gmail_extra"><br clear="all"><div><div class="gmail_signature"><div dir="ltr"><div>--Humble<br></div><br></div></div></div>
<br><div class="gmail_quote">On Thu, Nov 13, 2014 at 4:31 PM, Atin Mukherjee <span dir="ltr">&lt;<a href="mailto:amukherj@redhat.com" target="_blank">amukherj@redhat.com</a>&gt;</span> wrote:<br><blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">Folks,<br>
<br>
While I was looking into glusterd backlogs I could see there are few BZs<br>
which were marked as &quot;needinfo&quot; on the reporter as the information was<br>
not sufficient enough for further analysis and the reporter hasn&#39;t<br>
gotten back with the required details.<br>
<br>
Ideally we should close these bugs saying inadequate information,<br>
however I am just wondering should we set a timeline for the waiting<br>
period like 1 or 2 weeks if not more and then close all such instances<br>
to reduce the count.<br>
<br>
What do you guys think?<br>
<br>
~Atin<br>
_______________________________________________<br>
Gluster-devel mailing list<br>
<a href="mailto:Gluster-devel@gluster.org">Gluster-devel@gluster.org</a><br>
<a href="http://supercolony.gluster.org/mailman/listinfo/gluster-devel" target="_blank">http://supercolony.gluster.org/mailman/listinfo/gluster-devel</a><br>
</blockquote></div><br></div>