<div dir="ltr"><div class="gmail_extra"><br><div class="gmail_quote">On Thu, Jan 30, 2014 at 3:30 AM, Jeffrey Darcy <span dir="ltr">&lt;<a href="mailto:jdarcy@redhat.com" target="_blank">jdarcy@redhat.com</a>&gt;</span> wrote:<br>
<blockquote class="gmail_quote" style="margin:0 0 0 .8ex;border-left:1px #ccc solid;padding-left:1ex">I know we&#39;re all busy with other things, but it has been a little over a month<br>
since this discussion started.  There are a lot of really good comments on the<br>
Google Docs version (<a href="http://goo.gl/qLw3Vz" target="_blank">http://goo.gl/qLw3Vz</a>) and we&#39;re at risk of &quot;losing our<br>
place&quot; if we don&#39;t try to keep things going.  In particular, the issue of how<br>
these plans relate to 3.6 feature planning, which also needs to conclude soon.<br>
To pick a couple of examples:<br>
<br>
* There&#39;s a 3.6 item to make glusterd more scalable, but there are many more<br>
  scalability issues that need to be addressed and the later 4.0 proposal<br>
  tries to tackle a few.  Should we even try to address scalability in the<br>
  3.x series, or just leave it entirely to 4.x?  If we try to do both, how<br>
  should we resolve the incompatibilities that the second proposal introduces<br>
  relative to the first?<br>
<br>
* One of the hottest 3.6 items is tiering, data classification, whatever you<br>
  want to call it.  I say it&#39;s hot because everyone else - e.g. Ceph, HDFS,<br>
  Swift - has recognized this as an important feature and they&#39;re all making<br>
  significant moves here.  Again, the 4.0 proposal contains some ideas that<br>
  touch on this, not always compatible with earlier ideas.  Which should we<br>
  work on, and how should we address their differences?<br>
<br>
If we don&#39;t complete the discussions about 4.0, we won&#39;t be able to reach any<br>
reasonable conclusions about when/how it should diverge from 3.x.  Should we<br>
set a deadline for a second draft and/or an IRC meeting to discuss the comments<br>
we&#39;ve already collected?<br>
<br></blockquote><div><br></div><div>+1</div><div><br></div><div>It is very important to keep momentum for this, otherwise, the amount of work planned for 4.0 would never be &#39;done&#39;. Also, would be very important to track the deadlines as an action item in every weekly IRC meeting.</div>
<div><br></div><div>Regards,</div><div>Amar</div><div> </div></div></div></div>